D&RGW - Spring Division in O/On3
The railroad is built is a custom room, 21’ x 32’ in size, over the
garage. It features a walking flow design, allowing you to come
up the stairs and walked around the room to the end.
The layout is multi-level, with a lower staging yard, the main level
has dual gauge, standard and narrow gauge, main line loop, then
a branch line which climbs the mountainous terrain to reach the
summit.
Designed for both casual running and operations, with towns and
locations along the route for switching. During a semi-formal
session, 3 or 4 trains maybe in action, keeping Crews busy for
hours.
Benchwork is a normal 2x4 lumber, with a stud-wall style build,
providing a very solid frame and base for the layout. The photo
to right is a quarter scale mock up of the room and layout, before
construction started.
Trains are controlled using CVP EasyDCC wireless throttles.
Engines are equipped with sound decoders. During Operating
Sessions, the Crews use a printed Train Manifest (switchlist)
generated with RailOp software. Semi-formal sessions often
run 3 hours.
Visitor Note: layout is upstairs and has narrow aisles
If you have any questions, you can email
the Frolin, the web-master by clicking the icon.